Tenant Fit-up, Base Building, Retail, Restaurant Electrical Projects

NOVA Power Systems is well known for performing large scale tenant build-outs as well as being the “go to” contractor for local businesses within the community. A polished product combined with an efficient and cost effective method for tenant build-outs is our goal at NOVA Power Systems. We at NOVA take pride in providing venues with admirable lighting delivering the ambiance their customer’s deserve during their dining, entertainment or consumer experience.

img

Wisko Racing

  • Coordination- Direct design/build coordinated with End-user.
  • Specifics- Custom Design/Build, LED High-bay and specialty LED Track-lighting, Power distribution for misc. shop equipment as needed.
  • Timeline- 4 Months
  • Completion Date –  2/4/2013
img

Goose Creek Village South Site Lighting

  • Coordination- Direct design/build coordinated with End-user and Utility Providers
  • Specifics- Provide on-site coordination, installation, and turn-over of 40,000 linear feet of dry utility and site lighting pathway. Procurement and installation of (9) Utility vaults through-out site. Install 35’ LED Pole lights.
  • Timeline- 6 Months
  • Completion Date – 2012

 

img

Century One Professional Building

  • Coordination- New Construction built per Architect design through General Contractor
  • Specifics – Full design/build including installation of lighting and power distribution.
  • Timeline – 1 Year
  • Completion Date –   3/5/2013
img

Bungalows Lake House

  • Coordination- New Construction built per Architect design through General Contractor
  • Specifics – Design/Build including installation of interior lighting and power distribution for the use of the restaurant to provide an enjoyable dining experience for the restaurants customers.
  • Timeline – 4 Months
  • Completion Date –   3/5/2013
img

El Sol Azteca

  • Coordination- New Construction built per Architect design through General Contractor
  • Specifics – Design/Build including installation of interior lighting and power distribution for the use of the restaurant to provide an enjoyable dining experience for the restaurants customers.
  • Timeline – 6 Months
  •  Completion Date –  5/14/2013
img

Breaux Vineyards

  • Coordination- Design/Build per Architect design through General Contractor
  • Specifics – A base building upgrade for use of wine vineyard.
  • Timeline – 1 Year
  • Completion Date –  In Progress
img

Home for the Hatchet

  • Coordination- Design/Build per Architect design through General Contractor
  • Specifics – A base building design and build.
  • Timeline – 6 Months
  • Completion Date – 4/2014
img

Easter Seals Daycare

  • Coordination- New Construction built per Architect design through General Contractor
  • Specifics – A base building design and build for use of daycare.
  • Timeline – 6 Months
  • Completion Date –  2014
img

Director's Kitchen Upgrade

  • Coordination- Design/Build per Architect design through General Contractor
  • Specifics – A demolition design and build involving electrical work for use of kitchen within building.
  • Timeline – 3 Months
  • Completion Date –  4/2014
img

Rockville Cable Tray

  • Coordination- Design/Build per Architect design through General Contractor
  • Specifics – A 9 story base building cable tray installation involving electrical and telecommunications work.
  • Timeline – 6 Months
  • Completion Date –  12/2013